Will your site crash under load? Know before users do
Find where your system breaks and ship specific fixes. I build scripts, rig, report, and the optimization plan.
Operate as an external perf squad: join fast, run tests, and own the result.
Not a one-off: I make load testing a habit and help your team level up quality.
Start in 72h
Join the project, design scripts, and launch first runs quickly.
Production proof
Highload launches, peak sales, migrations. SLO-driven, budget-aware.
Report + plan
Metrics, bottlenecks, prioritized fixes, and quick wins list.
Assurance
Bottlenecks exposed
Availability
3 slots in the next 2 weeks
How it runs
Process: from goals to rerun
Transparent steps: metrics locked, progress visible, support after the report.
- 1
Diagnosis (Day 1)
Clarify targets: tps/rps, SLO/SLA, geo, traffic profile. Check access, metrics, and flows.
- 2
Scripts & rig
Write scenarios (k6/Locust/JMeter), spin up cloud rig, wire monitoring and logs.
- 3
Runs & measurements
Ramp load, capture profiles, record degradations, and catch errors.
- 4
Report & fixes
Metrics snapshot, top bottlenecks, quick wins, and prioritized optimization plan.
- 5
Follow-through
Support applying fixes, reruns, metric checks, and the final release.
- k6/Locust/JMeter scripts + how-to
- Report with charts and conclusions (PDF/Notion)
- Fix list with effort and quick wins
- Load rig and monitoring configuration
- Reruns after fixes (habit-forming cadence)
Proof
50k+ RPS
for a marketplace on Black Friday
< 200 ms
p95 after API optimizations
-30% cost
after infra right-sizing
Battle-tested
Handled products where downtime costs tens of thousands per hour.
FinTech
E-commerce
SaaS
Gaming
Case
Found a memory leak costing $20k
A marketplace saw latency spikes with user growth. Load run showed memory creep from cache. Fixed, reran — p95 back to 180ms, infra spend -18%.
FAQ
Addressing concerns upfront
Quick answers to common questions to help you decide.
What if the test finds nothing?
I still deliver 3–5 growth points. Worst case: confirmation with metrics and a clean bill of health.
Do you need production access?
No. I work on an isolated staging environment with limited-time access and test data.
How long does it take?
First runs within 72 hours. Full cycle with recommendations and rerun: 1–2 weeks.
Will you help implement fixes?
Yes, I support applying fixes and perform a rerun to validate the improvement.
Ready
Tell me about your system — I'll lock a slot and start
I'll share traffic cost, risks, and first hypotheses even before the main run.